Sydney Bus Network Redesign 2026: Route 100 runs from Bondi Ju
The redesign is being rolled out in stages across the metropolitan area, with the first stage completed in 2025 and the second stage planned for late 2026.
By Transport Desk • 8 min read
2 dispatches filed under this topic.
The redesign is being rolled out in stages across the metropolitan area, with the first stage completed in 2025 and the second stage planned for late 2026.
Transport for NSW is implementing the most significant redesign of Sydney's bus network in more than a decade, creating new cross-city routes.